HomeJewelry manufacture
Manufacture · since 1920

Jewelry manufacture

Argentum is a family jewelry manufacture operating continuously since 1920. We combine hand goldsmithing with modern in-house production in Koszelówka near Płock.

A jewelry manufactory since 1920

Argentum is a jewelry manufactory operating continuously since 1920 — today in the hands of the family's fifth generation. We combine hand goldsmithing with a modern machine base, designing, prototyping and making jewelry in silver, gold and titanium under one roof in Poland (Made in EU).

Craft and people

A manufactory's quality comes from its people: over 60% of our production staff have 20+ years of experience. Hand finishing, stone setting and detail control are skills no machine replaces — so we pair them with CNC and laser precision.

From design to finished piece

We run the full cycle: design and 3D model, casting, machining, laser engraving, electroplating and hand finishing. This lets us run both own collections and private label.

Scale and flexibility

We combine a manufactory's character with industrial capacity of 15,000–25,000 pieces a month. We handle short trial runs and serial production; the minimum order is 10 pieces per design, and the lead time is usually about 6 weeks from confirmation.

For brands and jewelry houses

We work with brands, jewelry houses, wholesalers and institutions. A century of craft is an argument that builds trust in your brand. See also custom production and our factory. Describe your project in the form — we will reply with a path to delivery.

Frequently asked questions

How does a manufactory differ from ordinary production?

A manufactory combines hand craft with machine production; with us that means hand finishing and detail control at industrial scale.

Since when have you been operating?

Continuously since 1920; today it is run by the fifth generation of the same family.

What is your production capacity?

15,000–25,000 pieces a month, handling short runs and serial production.

What is the minimum order and lead time?

The minimum order is 10 pieces per design, and the lead time is usually about 6 weeks from confirmation.

Do you offer private label?

Yes — full production under the client's brand, with confidentiality and CAD design rights held by the client.

Have a project? We will manufacture it in Europe.

Send a production enquiry